Fabrication

Westrock – Steel Structure

Location La Tuque, Québec
Year of realization 2019
Project type CAPEX

To allow for a change in its packaging product manufacturing process, the Westrock plant had to modify part of its Building #1. The integration of mechanical elements and the necessary modifications to the steel structures posed a significant design challenge.

Detailed design of a complex steel structure

TRINUM uses high-performance computer tools to work with complex structural geometries in 3D. Our designers were therefore able to produce all of the drawings for the project. In addition, our structural engineer was able to validate the structural calculations and all the connections.