Bloom Lake, Qc
Year of realization
2021
Type of project
Capex
In 2021, Champion Iron Mines started a major capacity upgrade of it’s Lake Bloom mine. The expansion project doubled the production to e à 15 TMPA of iron concentrate at 66,2 % Fe.

Structural and Mechanical Engineering
Trinum designed two large ore conveyors and the assiciated transfer tower. Our team prepared the complete 3D models, drawings and plans down to the fabrication drawings.